STABILITY OF TUNNEL WALL ROCKS OF WESTERN SECTION OF WUHAN-SHIYAN SPEEDWAY
-
摘要: 依据工程地质勘察资料, 利用地质分析方法、试验参数的数理统计、极射赤平投影图和对典型工程实例的分析等手段, 研究了影响隧道围岩稳定的主要因素和围岩类别的主要特征, 认为坍塌是隧道工程的主要工程地质问题, 脉体边缘片理发育带、裂隙及降雨是影响隧道围岩稳定的主要因素.Abstract: Based on the exploration data of engineering geology, and by means of geological method and the analysis of mathematical statistics of test parameters, polus morphism project figures as well as the analysis of a typical engineering case, the main characteristics of the rock types and the factors affecting the stability of the tunnel wall rocks are studied, which makes a conclusion that the collapse is the major engineering geology problem in the tunnel engineering and that the development of the schistosity in the vein body fringe and cracks and precipitation significantly affect the stability of tunnel wall rocks.
-
表 1 各类围岩物理力学性质统计
Table 1. Statistics of physical-mechanical properties for different wall rocks
-
[1] 湖北省地质矿产局. 湖北省区域地质志[M]. 北京: 地质出版社, 1990. [2] JTJ004—1989, 公路工程抗震设计规范[S]. [3] 张倬元, 王士天, 王兰生. 工程地质分析原理[M]. 北京: 地质出版社, 1981. [4] JTJ064—98, 公路工程地质勘察规范[S].
点击查看大图
表(1)
计量
- 文章访问数: 3437
- HTML全文浏览量: 101
- PDF下载量: 2
- 被引次数: 0