[1] |
赵鹏大陈永清. 地质异常矿体定位的基本途径[J]. 地球科学———中国地质大学学报1998 23(2): 111~114. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX802.000.htm
|
[2] |
赵鹏大陈永清刘吉平等. 地质异常成矿预测理论与实践[M]. 武汉: 中国地质大学出版社1999.138.
|
[3] |
赵鹏大, 陈永清, 金友渔. 基于地质异常的"5P"找矿地段的定量圈定与评价[J]. 地质论评2000, 46(增刊): 1~12. https://www.cnki.com.cn/Article/CJFDTOTAL-DZLP2000S1005.htm
|
[4] |
Gorelov D A. Quantitative characteristics of geological anomalies in assessing ore capacity[J]. Internal Geology Review, 1982 (4): 457~465.
|
[5] |
Laznicak P. Giant ore deposits: a quantitative approach[J]. Global Tectonics Metallogeny, 1983 2(1&2): 41~63.
|
[6] |
Laznicak P. Quantitative relationships among giant deposits of metals[J]. Economic Geology, 1999, 94(4): 455~473. doi: 10.2113/gsecongeo.94.4.455
|
[7] |
Schuiling R D. 环大西洋大陆上的锡矿带[A]. 见: 赖特J B, 主编. 矿床、大陆漂移和板块构造[C]. 陈昌明, 陈志明, 译. 北京: 地质出版社1982.17~22.
|
[8] |
谢学锦向运川. 巨型矿床的预测方法[A]. 见: 谢学锦, 邵跃, 王学求, 主编. 走向21世纪矿产勘查地球化学[C]. 北京: 地质出版社1999.61~91.
|
[9] |
陈永清, 赵鹏大, 刘红光. 鲁西金矿成矿组分的聚集与演化[J]. 地球科学———中国地质大学学报, 2001, 25(1): 51~58. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200101008.htm
|
[10] |
Chen Y Q, Liu H G. Delineation of potential mineral resources region based on geoanomaly unit[J]. Journal of China University of Geosciences, 2000, 11(2): 158~163.
|
[11] |
Pan G C, Harris D P. Information synthesis for mineral exploration[M]. New York: Oxford University Press, 2000.461.
|
[12] |
McCammon R B, Botbal J M, Larsen R S. Characteristic analysis-1981: final program and a possible discovery[J]. Math Geology, 1983, 15(1): 59~84. doi: 10.1007/BF01030076
|
[13] |
Pan G C. Canonical favorability model for data integration and mineral potential mapping[J]. Comput Geosci, 1993, 19: 1077~1100. doi: 10.1016/0098-3004(93)90016-X
|
[14] |
Agterberg F P, Bonham-Cater G F, Cheng Q, et al. Weights of evidence modeling and weighted logistic regression for mineral potential mapping[A]. In: Davis J C, Herzfield U C, eds. Computer in Geology-25 Years of Progress[C]. New York: Oxford University Press, 1993.13~32.
|
[15] |
Pan G C. Extended weights of evidence modeling for the pseudo-estimation of metal grades[J]. Nonrenew Resour, 1996, 5(1): 53~76. doi: 10.1007/BF02259070
|
[16] |
Hu G D, Chen J G, Chen S Y. Metallic mineral resources assessment and analysis system design[J]. Journal of China University of Geosciences, 2000, 11(3): 308~311.
|