• 中国出版政府奖提名奖

    中国百强科技报刊

    湖北出版政府奖

    中国高校百佳科技期刊

    中国最美期刊

    留言板

    尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

    姓名
    邮箱
    手机号码
    标题
    留言内容
    验证码

    预应力锚索抗滑桩结构计算方法

    桂树强

    桂树强, 2005. 预应力锚索抗滑桩结构计算方法. 地球科学, 30(2): 233-240.
    引用本文: 桂树强, 2005. 预应力锚索抗滑桩结构计算方法. 地球科学, 30(2): 233-240.
    GUI Shu-qiang, 2005. Design Method for Using Stabilizing Piles with Pre-stressed Anchored Cables in Landslide Remediation Works. Earth Science, 30(2): 233-240.
    Citation: GUI Shu-qiang, 2005. Design Method for Using Stabilizing Piles with Pre-stressed Anchored Cables in Landslide Remediation Works. Earth Science, 30(2): 233-240.

    预应力锚索抗滑桩结构计算方法

    基金项目: 

    教育部博士生基金资助项目 20030491004

    详细信息
      作者简介:

      桂树强(1974 -), 男, 工程师, 中国地质大学地质工程专业博士研究生, 主要从事地质灾害防治工程设计研究

    • 中图分类号: P64

    Design Method for Using Stabilizing Piles with Pre-stressed Anchored Cables in Landslide Remediation Works

    • 摘要: 预应力锚索抗滑桩作为一种实用有效的支挡工程措施已在地质灾害治理中得到广泛的应用.然而, 其设计与计算方法仍然是一个亟待深入研究的课题.这种技术是在抗滑桩的基础上发展起来的.相对于普通抗滑桩, 其受力状态更加合理. 从这种治理措施的地质与物理模型出发, 建立了其力学与数学模型, 并最终得到其内力分布的解析解, 为其结构设计奠定了基础.将双参数法引入到土抗力模数或地基系数的计算中, 并贯穿到整个结构计算中.分别按刚性桩和弹性桩2种物理模式, 将锚索视为弹性绞支座, 利用抗滑桩和锚索位移变形协调条件, 计算出锚索的设计拉力及桩身的内力分布.结合三峡库区秭归县水田坝乡下土地岭滑坡治理工程介绍了这种滑坡治理措施的应用, 并与原普通抗滑桩设计方案进行了技术与经济对比分析, 体现出这种抗滑结构的优越性.

       

    • 图  1  预应力锚索抗滑桩结构体系示意

      Fig.  1.  Sketch map of the structure of stabilizing piles with pre-stressed anchored cables

      图  2  预应力锚索抗滑桩变形协调原理示意

      Fig.  2.  Sketch map of deformation harmony principle of the structure of stabilizing piles with pre-stressed anchored cables

      图  3  预应力锚索抗滑桩结构计算示意(刚性桩)

      Fig.  3.  Sketch map of the structure of stabilizing piles with pre-stressed anchored cables for calculation (rigid pile model)

      图  4  预应力锚索抗滑桩结构计算示意(弹性桩)

      Fig.  4.  Sketch map of the structure of stabilizing piles with pre-stressed anchor cables for calculation (elastic pile model)

      图  5  下土地岭滑坡治理工程剖面示意

      Fig.  5.  Sketch map of the profile of remediation work of Xiatudiling landslide

      图  6  桩身剪力

      Fig.  6.  Shear forces diagram of the pile body

      图  7  桩身弯矩

      Fig.  7.  Bending moments diagram of the pile body

      表  1  预应力锚索抗滑桩与普通抗滑桩设计方案工程量对比

      Table  1.   Comparison of project work components between stabilizing piles with pre-stressed anchor cables and ordinary stabilizing piles

    • [1] Chen, Z., 2001. Designing and calculating prestressed anchor cable-pile. Earth Science— Journal of China University of Geosciences, 26(4): 352 -356(in Chinese with English abstract). http://en.cnki.com.cn/Article_en/CJFDTOTAL-DQKX200104005.htm
      [2] Gui, S.Q., 2003. Calculating and design method and their applications of stabilizing piles with pre-stressed anchored cables in landslides remediation works(Dissertation). China University of Geosciences, Wuhan(in Chinese with English abstract).
      [3] Institute of Exploration and Surveying in Shenzhen City, Geotechnical Engineering Company of Shenzhen City, 1996. Technical code for retaining and protection of deep building foundation excavation in Shenzhen area (SJG05 -96), Institnte of Exploration and Surverying in Shenzhen(in Chinese).
      [4] No. 2 Survey and Design Institute of Ministry of Railways, 1983. Design and calculation of stabilizing pile. China Railway Publishing House, Beijing(in Chinese).
      [5] Northwest Branch of China Academy of Railway Sciences, 1997. Landslide prevention and remediation. China Railway Publishing House, Beijing(in Chinese).
      [6] Wang, H.Q., Li, C.Z., Liu, L.Z., et al., 1990. Design and construction of stabilizing pile with pre-stressed anchored cables. Proceedings of landslide in China, Vol. 7. China Railway Publishing House, Beijing(in Chinese).
      [7] Wu, H.L., 2000. Composite stiffness principle and biparameter method for laterally loaded pile. Second edition. People's Communication Press, Beijing(in Chinese).
      [8] Wu, Y. P., Wang, Y., 2002. Preliminary design report of Xiatudiling landslide in Zigui County, Hubei Province, China. China University of Geosciences, Wuhan(in Chinese).
      [9] Xu, B.D., 2001. Landslide analysis and control. China Railway Publishing House, Beijing, 699 -721(in Chinese).
      [10] Zhou, D.P., Wang, J.S., 2002. Design method of retaining pile pre-stressed cable. Chinese Journal of Rock Mechanics and Engineering, 21(2): 247 -250(in Chinese with English abstract).
      [11] 陈占, 2001. 预应力锚索桩设计与计算. 地球科学——中国地质大学学报, 26(4): 352 -356. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200104005.htm
      [12] 桂树强, 2003. 预应力锚索抗滑桩设计与计算方法研究及工程应用(硕士学位论文). 武汉: 中国地质大学.
      [13] 深圳市勘察测绘院, 深圳市岩土工程公司, 1996. 深圳地区建筑深基坑支护技术规范(SJG 05 -96). 深圳: 深圳市勘察测绘院出版. 6 -7.
      [14] 铁道部第二勘测设计院, 1983. 抗滑桩设计与计算. 北京: 中国铁道出版社.
      [15] 铁道部科学研究院西北研究所, 1977. 滑坡防治. 北京: 人民铁道出版社, 304 -472.
      [16] 王化卿, 李传珠, 刘励忠, 等, 1990. 预应力锚索抗滑桩设计与施工. 滑坡文集, NO. 7. 北京: 中国铁道出版社, 34 -41.
      [17] 吴恒力, 2000. 计算推力桩的综合刚度原理和双参数法(第二版). 北京: 人民交通出版社.
      [18] 吴益平, 汪洋, 2002. 秭归县水田坝乡下土地岭滑坡初步设计报告. 武汉: 中国地质大学.
      [19] 徐邦栋, 2001. 滑坡分析与防治. 北京: 中国铁道出版社, 699 -721.
      [20] 周德培, 王建松, 2002. 预应力锚索桩内力的一种计算方法. 岩石力学与工程学报, 21(2): 247 -250. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX200202022.htm
    • 加载中
    图(7) / 表(1)
    计量
    • 文章访问数:  3406
    • HTML全文浏览量:  77
    • PDF下载量:  2
    • 被引次数: 0
    出版历程
    • 收稿日期:  2004-07-15
    • 刊出日期:  2005-03-25

    目录

      /

      返回文章
      返回