Deng Yiming, 2001. MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY. Earth Science, 26(4): 419-423.
Citation: Deng Yiming, 2001. MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY. Earth Science, 26(4): 419-423.

MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY

  • Received Date: 2001-04-05
  • Publish Date: 2001-07-25
  • It is very important to choose the right controlling line scheme as the engineering geological conditions are very complicated in Zhicheng-Wanxian railway. The paper analyzes the geological background in the area and summarizes its characteristics and laws of engineering geology and hydrogeology and finally figures out the key geological problems of controlling line scheme in order to determine the principles of the engineering geological locations and the direction of alternative scheme.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(4)  / Tables(2)

    Article views (3569) PDF downloads(3) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return